| Structure
System |
|
-
Substructure
|
|
|
Foundation
|
Bore
Pile System |
|
-
Basement Storey
|
Reinforced
Concrete Flat Slab System |
|
-
Superstructure
|
|
1st
Storey to Roof
|
Post
Tensioned Flat Slab System |
Floor Loading and Fire Rating |
|
-
Live Loads
|
|
|
Floor
|
KN/sq.
m. |
|
Basement
Carpark
|
3.0 |
|
1st
Storey
|
20.0 |
|
2nd
Storey to 4th Storey
|
15.0 |
|
Roof
|
3.0 |
|
M&E
Area
|
7.5
(or to M&E requirement) |
|
-
Fire Rating
|
|
|
The
structure design for the building has considered a four-hour fire-rating.
|
Ceiling Height |
|
-
Floor to floor height for warehouse is 6 m.
|
|
-
Ceiling height for offices is 3.5 m.
|
Column Grids |
|
-
Mostly 11.5m x 9.6m.
|
External Walls |
|
-
Granite cladded finish to building base at 1st storey level.
|
|
-
110mm thick brick wall with plaster and spray texture coating to
upper storeys.
|
Internal Walls |
|
-
Passenger lift lobby
|
-
|
Marble/granite
finish to 1 m height, with the rest of the wall either in clear
tempered glass panel or timber finish. |
|
-
Cargo lift lobby
|
-
|
Cement
and sand plaster and emulsion paint. |
|
-
Office & Warehouse
|
-
|
110mm
thick concrete block wall with plaster and emulsion paint. |
|
-
Toilets
|
-
|
Glazed
ceramic tile to 2.2m height. Above is emulsion paint. |
False Ceiling |
|
-
Passenger lift lobby
|
-
|
Fibrous
gypsum plaster board. |
|
-
Cargo lift lobby
|
-
|
Suspended
mineral board ceiling at 4.5m heght. |
|
-
Toilets
|
-
|
Water-resistant
suspended mineral board ceiling. |
|
-
Office
|
-
|
Mineral
board ceiling suspended by aluminium grid at 3.5m height. |
Floor Finishes |
|
-
Passenger Lift Lobby
|
-
|
Granite
slab with pattern. |
|
-
Cargo lift lobby
|
-
|
Power-floated
floor with floor hardener and dust-proofer. |
|
-
Warehouse
|
-
|
Power-floated
floor with floor hardener and dust-proofer. |
|
-
Office
|
-
|
Power-floated
and bare concrete finish. |
|
-
Toilets
|
-
|
Non-slip
homogeneous/ceramic tiles. |
Air-Conditioning and Mechanical Ventilation System (AC/MV) |
|
-
Mechanical Ventilation System for warehouse space is provided.
|
| -
Space and power provision for full air-conditioning of warehouse space. |
| -
Air-conditioning (VRV) system for office space and lift lobbies provided. |
Electrical System |
| -
PowerGrid supplying 22KV 50Hz 3 phase power supply via two (2) incoming
feeders, stepped down to 400V 50Hz 3 phase and 230V 1 phase 50Hz to
the Consumer’s L.T. switchboard for the development distribution and
utilization. |
| - The
electrical approved load allowable for the development is 2000KVA. |
| -
1 x 750 KVA emergency diesel generator provide emergency power to
essential loads in the unlikely event of any PowerGrid power failure. |
| -
Recessed fluorescent light fittings with optics reflector to office
area providing an average illumination level of 500 lux at desk height. |
| -
Emergency luminaries and exit light fitting with a built-in 2 hrs
duration battery pack are provided strategically in accordance with
Singapore Standard CP19:1991 for emergency evacuation. |
| -
The building is provided with lightning protection system which is
designed in accordance with Singapore Standard CP33:1985. |
|
- Individual
Distribution Board c/w surge arrester is provided in each tenanted
office unit for proper distribution/maintenance and office equipment
protection respectively.
|
Fire Protection System |
| -
Automatic fire sprinkler designed to CP52, Extra High Hazard requirement. |
| -
Fire Extinguishers, hosereels and new addressable analog fire alarm
system are also provided. |
Sanitary System |
| -
Good and custom designed sanitary fittings complete with pipings for
all toilets. |
| -
Provision of sanitary floor trap in warehouse tenant unit for future
wash basin and condensate discharge.
|
Security System |
| -
Closed-circuit television cameras and Card Access readers cum door
monitoring contacts are provided at lift lobbies/driveway and designated
doors respectively for security surveillance purposes. |
| -
24 hour manned security.
|
Lift System |
| -
Two (2) nos. of designer-finished passenger lift serving all tenanted
floors are provided for Office tenants. |
|
Capacity |
:
2 x 1000 kg (15 persons) |
| -
Four (4) nos. of goods lifts and one (1) no. of service lift serving
all tenanted floors are provided for the Warehouse’s tenants. |
| Capacity |
:
1 x 1500 kg Service Lift with an internal car size of
1530mm (W) x 2250mm (D) x 2600mm (H) |
|
:
3 x 3000 kg Goods Lift with an internal car size of
2500mm (W) x 2200mm (D) x 2700mm (H) |
|
: 1 x 5000 kg
Goods Lift with an internal car size of
2600mm
(W) x 3600mm (D) x 2900mm (H)
|
Lift Car Interior Finishes |
| -
Passenger Lifts |
:
Granite floor. |
|
:
Stainless steel finish combines with timber finish on walls. |
|
:
Stainless steel ceiling with light diffusers. |
| -
Cargo Lifts |
:
Stainless steel checker plate on floor. |
|
:
Stainless steel ceiling panel with light diffusers. |
|
:
Stainless steel with spray paint finish on wall. |
Telephone Distribution and Telecommunication Facilities |
| -
Infrastructure for telecommunication services which are designed in
accordance with Singapore Telecom’s requirement is provided. |
| -
One (1) no. distribution panel at each Telecom riser with cable tray
installed at common corridor is provided for facilitating the telecommunication
services to the units. |
Master Antenna Television (MATV) System |
| -
MATV tap-off point is provided at each ELV riser for any tapping of
signal reception to the units. |
Water Supply |
| -
Water supply for tenants can be tapped from water risers provided
in the building via high level storage tanks. |
Common Amenities |
| -
24 hour building access. |
| -
One roof-top tennis court. |
| -
One roof-top multi-function pavilion. |
| -
Handicapped accessible. |
| -
Provision for roof-top helipad. |
| -
Provision for roof-top satellite dish. |